PLS Fitness-Check
Fitness-Check

Are outdated distributed control systems
holding back your success?

We make your automation fit for the future!

  1. Initial assessment
  2. Analysis & evaluation
  3. Creation of final report with action plan

Why SPIEGLTEC Fitness-Check?

We check your distributed control system (DCS) independently of software and hardware providers. Our focus is on:

We work toward one goal: making your plant fit for the present and future and creating an individual action plan with different expansion stages.

How it works

3 steps to future-proof
automation

1. Initial assessment

We collect all relevant data and information about your existing plants and systems.

  • Data and information collection: We collect information about current processes, technologies, and systems, including documentation of existing DCS systems, logistics processes, and automation solutions.
  • Interviews and workshops: Through discussions with your employees, we gain a deep understanding of current processes and challenges.
  • Document analysis: We review existing documentation, plans, and reports to obtain a comprehensive picture of your infrastructure.

2. Analysis and evaluation

A detailed analysis of the collected data to assess the current technical condition and identify potential failure risks.

  • Technical evaluation: Analysis of the age, structure, and reliability of your DCS system in comparison to current standards and best practices.
  • Risk analysis: Identification of potential risks and vulnerabilities, as well as evaluation of the impact of system failures and redundancy requirements.

3. Final report & action plan

Preparation of a structured final report with recommendations for troubleshooting and optimization based on the findings. The report includes:

  • Overview of identified problems and vulnerabilities
  • Analysis of the causes (root cause analysis)
  • Presentation of the impact on operation, quality, and efficiency
  • Suggestions for short-term and long-term optimization measures
  • Prioritization of measures according to urgency and benefit
  • Rough cost estimate: Determination of the expected costs associated with the measures

Your fitness coaches:
The SPIEGLTEC team

Our team currently comprises 13 members with a wide range of expertise and experience.

Your fitness coaches

Process Automation Engineering PAE

Christoph Walder

christoph.walder@spiegltec.com

Daniel Brandacher

daniel.brandacher@spiegltec.com

Andreas Hauser

andreas.hauser@spiegltec.com

We also offer the following services:

Ready for future-proof automation?

Contact us and have your DCS independently reviewed!

Get in Touch

We are here for you.

Suche
Search

Kurze Installationszeiten

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Get in Touch

Jetzt Rückruf anfordern.